What to Send for a Solar Mounting Structure Quotation
For a frame quote, send the site, roof type and panel count. Name the panel model. Add a plan or a sketch. Say if the panels go on a roof or on the ground.

Only know the power in kW? Ask for a rough price. Ask what panel size the shop used.
Jump to the solar mounting quote checklist.
Step 1. Show the site
Give the city and site name, then mark the space you want to use. Send a few photos if you have them, and show how parts can get to that spot.
| Site type | What to send |
|---|---|
| Flat concrete roof | Roof plan, levels and any limits on holes in the roof |
| Sheet-metal roof | Roof shape, slope and support details if shown on the plan |
| Ground mount | Plot size, layout and any approved ground or base details |
| Add-on to a frame | Photos and sizes of the old frame, plus the new panel data |
On a roof plan, mark drains, tanks and paths that must stay clear. For a ground site, mark the space that has to stay open. Show where trucks can stop. A long rail may be hard to move up a small stair.
Step 2. Send the panel data sheet
Send the make, model and count. Add the length, width, frame depth and weight. Check the data sheet for each size. Mark where the clamps can go. Use the marks on the data sheet.
Show which way the panels face. Mark if their long side stands up or lies across the row. Two jobs may call for the same power. The panels may still need a new frame size.
Step 3. Draw the rows
Mark each row and its panel count. Say if there is a set height or tilt in the plan. Leave the paths and clear space on the sketch. Mark any spot that still needs a site check.
For a roof job, get a qualified engineer to check the roof. Ask them to check the frame plan too. That check covers how the frame takes wind and weight. It should come before work on site. A budget quote does not tell you what a roof can hold. Rooftop solar site planning reference
Step 4. Check what the price buys
Ask for a list of the frame parts, clamps and bolts. Say which finish the job needs. Does the plan call for a zinc coat? Say when the coat needs to go on.
Ask who does the site check, who fits the frame and who does the roof or ground work. Get freight and tax on their own lines. Ask when the frame will be ready. Ask how long the price is good for.
| Stage | What to send |
|---|---|
| Budget price | Site, likely panel count, roof or ground type and a sketch |
| Final order | Final panel model, agreed plan, finish and approved site design details |
Solar mounting quote checklist

This is a sample request. Use the details from your own job.
| Field | Sample entry |
|---|---|
| Site and roof | Karachi, flat concrete roof |
| Panels | 24, data sheet attached |
| Rows | 3 rows of 8 |
| Scope | Frame and fixings, with site work priced on its own line |
| Finish and freight | Follow the finish note and list freight on its own line |
Quick questions
Can I ask for a price before I buy panels?
Yes. Share the panel you plan to use. Ask the shop to name that panel in the quote.
Is a CAD file needed?
A sketch can start the quote. Send the agreed plan before you place the order.
Send your layout for a price
Send your sketch and panel data to Tawakkal. Say if you want the frame on its own or need a price for site work too. See our hot-dip galvanizing service if the frame needs that coat.
See solar mounting structures or request a solar mounting quote.